Sök:

Sökresultat:

2653 Uppsatser om Power grid - Sida 1 av 177

Trafikverkets effektstyrningssystem - EFS 132 kV : Bidraget till minskade förluster

The technological legacy from the early electrification of the Swedish railroads has resulted in a Power grid with a lower grid frequency than the national Power grid from which it is fed. Energy transfer between these Power grids with different frequencies requires substations, adapting the grid frequency for the rail road Power grid. For this purpose, a feeding Power grid has been built, stretching across the country from Boden in the north to Tälle/Häggvik in the south.Power transfer in the Swedish Power grid results in voltage angle differences which increase with increasing loads and transfer distance. These voltage angle differences are transferred from the power feeding substations to the rail road Power grid, will in some extent cause loss of energy due to unwanted power flows from north to south.To minimize the losses due to this phenomenon, a power management system called EFS 132 kV has been developed and implemented. The system minimizes the unwanted power flows and controls the desired power flow for a good distribution of loads between the power feeding substations.This thesis investigates the extent of the transmission losses avoided due to the EFS 132 kV that coordinates the idling angles to a common reference point.The results indicate that EFS 132 kV affects the power flow, especially between the northern substations through an improved load distribution.

VSM och 16 förluster

With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent Power grid has been created in Simulink/SimPowerSystems. Parameters for the Power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.

Framtidens elbilar utmanar nutidens elnät : Påverkan av ett ökat antal elbilar på ett halländskt elnät

The challenges facing low voltage grids are rising as an increasing number of domestic houses transition from fossil fueled heating to electricity based heating. Several environmental goals and visions have the same transition from fossil based power to electricity based power in mind for the transportation sector. One of the most important tools for this transformation is widely regarded to be the electric vehicle. With the demands of the electric vehicle pressuring the Power grid, several questions arise regarding the growth of the electric vehicle market and what repercussions it may have on the grid. This paper focuses on a typical low voltage grid in southern Sweden and what effects a growing electric vehicle market may have on it. Through computer-assisted simulations based on several future scenarios regarding the EV market, this paper finds that few modifications and reinforcements are needed on this particular grid within the next 10 to 15 years.

Simulering av vindkraftverk och närliggande elnät vid Risholmen i Göteborg i SimPowerSystems

With background in the rapidly growing need to find solutions for sustainable energy production and the increasing interest for wind power, this report was written. With take-off point from the wind power plant Big Glenn, which has been built in the harbour of Gothenburg, a model of the adjacent Power grid has been created in Simulink/SimPowerSystems. Parameters for the Power grid and its components has been provided by Göteborg Energi Nät, that has also been the supplier of measurement data of produced power, the power need from loads in the vicinity, voltage levels, current values and also the variation of power factor at the wind power plant.The SimPowerSystems model has been used to perform simulations of power flow in the grid. These simulated values have then been compared to the measured values to verify the functionality of the model. Further, the model has been used to perform simulations of a grid fault, which causes a voltage drop.

Nätnyttomodellen och dess inverkan på ett distributionsnät - En studie i samarbete med Härryda Energi AB

This report is intended to give an insight in the Network Performance Assessment Modeland the parameters that is needed in the making of a fictitious grid that represents anoptimal grid. A main goal is to investigate how the construction of a real grid iscompared to the fictitious.One of the key parameters is how redundancy is treated in the model and to find theoptimal amount of redundancy versus the costs. Further is the dimensioning of the grid ofinterest. The fictitious grid is based on energy whereas the real grid often is based onsubscribed power and these two principles are compared and analyzed.The difference in the outcome of the model result due to variations in input data of themodel is also discussed in the report..

Utveckling och tillämpning av modeller förkvantifiering av de ekonomiska konsekvensernaav ökad förbrukningsflexibilitet inom eldistribution

One step towards a more sustainable energy system is to create a more flexible electrical grid, where increased demand response among electricity consumers can play an important role. A distribution grid owner can encourage their customers to use electricity more evenly distributed during the day by introducing different types of grid fees such as time-differentiated power tariffs. In this master thesis, the theoretical economic impact of a flattened load profile for a distribution grid owner is investigated. Different factors that impact the distribution grid owner?s economy are identified and two are chosen to be quantified; losses in the grid and the fee to the feeding grid.

Utvärdering av konsekvenserna för nätanslutning av vindkraftparker i Sverige vid införandet av nätkoden Requirements for Generators

Grid codes are becoming more demanding on power generating units due to the factthat the complexity of the Power grid is increasing. The penetration of wind powerhas grown over the last years and it is clear that wind farms need to be addressedwith the same type of grid codes as conventional generation units. There is howeveran undeniable difference between the technology in conventional synchronousgeneration units, and the asynchronous generation units in wind farms.This thesis has reviewed the current grid code in Sweden and compared it to the newcode proposed by ENTSO-E, ?the Requirements for Generators?, in the aspect ofwind farms with an installed power of 30 MW or more. The comparison has beencomplemented by an analysis of how wind farms of two different technologies(Doubly fed induction generators and full power converters) can meet therequirements and technical proposals have been given on how to be able to meetcompliance with the new grid codes.The Requirements for Generators contains many non-exhaustive and optionalrequirements, because of this it has been difficult to, at this stage, exactly point outthe technical impact on the grid connection of future wind farms in Sweden.

En vindkraftparks inverkan på Gävle Energis elnät

The effects from a planned wind farm on the grid utility Gävle Energis electrical grid have been studied. The wind farm is planned to be built in the forest 15 km north of Gävle and will have 23 turbines with rated power from 2 to 2.5 MW, resulting in a total installed power between 46 MW and 57.5 MW. The grid connection will be made at 70 kV. The aim of the analysis was to determine what effects the wind farm would have on the Power grid in the form of electrical disturbances (flicker etc.), need for new investment and raised operational cost. To allow the connection of the wind farm technical solutions (new lines, power stations and grid reinforcements) have been constructed.

Smarta elnät i Sverige : Energibranschens förutsättningar och förväntningar

The need for a more efficient electrical grid has made the smart grid concept popular in recent years. The aims of this study are to identify the conditions in Sweden for implementing a smart grid and to analyse the opinions of stakeholders. One finding is that the large capacity of Sweden?s existing electrical grid decreases the immediate need for smart grid solutions. However, the rapid increase in wind power might push the development of a smart grid in the coming years.

Undersökning av elkvalitet i distributionsnät med omfattande vindkraftselproduktion

The goal for this master thesis project has been to investigate the power quality in adistribution grid, which has a high fraction of dispersed power production due towindmills. The study has been done on a grid in Laholm South of Halmstad, whereapproximately 45 windmills are connected to the distribution grid owned by SHKEnergi. The investigation has been focused on to two radialy fed 20 kV lines, wheretwelve windmills are connected.Voltage variations have been studied by creating a model of the grid in the simulationprogram SIMPOW. The largest deviation that has been found in any point of the gridis ±1.9 % of the nominal voltage. This deviation is a result of varying powergeneration from the windmills and the voltage regulation at the connection point ofthe line.

Värmning av avloppsvatten med spillvärme för att förbättra kvävereningen -Temperaturens inverkan på kvävereningen

The goal for this master thesis project has been to investigate the power quality in adistribution grid, which has a high fraction of dispersed power production due towindmills. The study has been done on a grid in Laholm South of Halmstad, whereapproximately 45 windmills are connected to the distribution grid owned by SHKEnergi. The investigation has been focused on to two radialy fed 20 kV lines, wheretwelve windmills are connected.Voltage variations have been studied by creating a model of the grid in the simulationprogram SIMPOW. The largest deviation that has been found in any point of the gridis ±1.9 % of the nominal voltage. This deviation is a result of varying powergeneration from the windmills and the voltage regulation at the connection point ofthe line.

Metoder för kartläggning och analys av nätförluster i lågspänningsnät

An important process for grid companies in order to reduce power losses in electricity distribution grids is to figure out where and how they appear. This report describes the factors that cause power losses in low voltage distribution grids and methods for how they could be measured and analyzed. Measurement data for consumed and injected energy were collected for twelve low voltage distribution grids owned by Gävle Energi AB in order to analyze the size of the power losses and how the measurement uncertainty affects the collected data. Then models of three of the grids were created in MATLAB in order to analyze the data and the power losses were calculated to be compared to the collected data. Curve fitting were also used as a method in order to analyze the power losses from collected data.The results show that the losses in the studied grids are low.

Ny stamstation i Yttermalung för anslutning av vindkraft : Nätstudie av olika utföranden i normal- och reservdrift

Since 2004, wind power has had the largest installation of new capacity compared to other energy sources in Sweden. Accommodating new wind power may require strengthening or rebuilding of the existing grid in areas where the grid is already loaded to maximum capacity. This master thesis examine the possibility of a new 400/130 kV substation in Yttermalung, Sweden, with a connection to the two neighboring regional grids in Dalarna and Värmland owned by Fortum. This substation would provide a new connection point to the Swedish transmission system as well as an interconnection of the two, currently separated, regional grids. Different expansion scenarios where a substation with and without series compensation or a phase shifting transformer (PST) to control active power flow were studied.

vindkraftens påverkan på elkvaliten

This thesis concerns how the power quality in the grid is affected by the connection of wind power plants. As things are at present, Fortum Distribution AB has a number of wind turbines and wind parks connected to the own grid. As the pressure on building and connecting additional wind power is increasing, so is also the interest of how the already existing wind power generation affects the power quality in the nearby distribution grids. The study is performed by direction of Fortum Distribution AB and is limited to the 10 kV/40 kV-grid in Bohuslän, Sweden. The methods for calculation of power quality are compared to the results of a number of measurements.

Tillförlitlighet hos trafikolycksklassificering

Today?s wind power plants are only compensated for their reactive power consumption at no-load. As the wind power plants grow bigger the amount of reactive power they need also increases. This is no longer a problem that can be ignored, especially as the net owners are beginning to charge the reactive power they transport.In this thesis a couple of different methods of compensation and their prices will be discussed and evaluated. Problems, such as self-excitation, that can occur if one fully compensates the wind power plant will also be brought to surface.

1 Nästa sida ->